USB · shared bandwidth planner
Budget the hub’s one upstream pool.
Add simultaneous device traffic without assuming that every downstream port has a private link.
Concurrent workload
Use simultaneous demand, not device labels
An SSD advertised at 10 Gbps does not constantly consume 10 Gbps. Enter a defensible workload budget for devices active at the same time, keep the planning share explicit, then test the real workload.
For decimal MB/s, multiply by 8 and divide by 1,000: 400 MB/s is 3.2 Gbps. MiB/s is a different unit. The planning share is your assumption, not measured efficiency. This aggregate screen does not model directional scheduling or guarantee throughput or latency.
Power is separate: external hub power does not increase upstream bandwidth. Use the Hub Power Budget Planner for supply limits, and the worked example and controlled test sequence before combining devices.